D.C. Municipal Regulations (Last Updated: September 13, 2017) |
Title 22. HEALTH |
SubTilte 22-B. PUBLIC HEALTH AND MEDICINE |
Chapter 22-B43. CERTIFICATE OF NEED REVIEW PROCEDURES |
Section 22-B4306. CLOSING THE PROJECT RECORD
-
4306.1The record for a decision on issuing or modifying a CON shall close at the end of the second (2nd) business day following the meeting of a Committee of the SHCC at which the Committee makes the initial recommendation on the application; provided, that the record shall include those proceedings of the SHCC during which the application was considered, concluding with the final SHCC vote taken on the application.
4306.2 When SHPDA conducts an expedited review the record shall close five (5) business days before the date of decision.
4306.3The Director may order that the record remain open for a longer period of time if the Director determines that keeping the record open is necessary to ensure an adequate record.
4306.4The SHCC and the Director shall not consider information received from a person after the date specified in the notice (unless the Director extends the record) to make a recommendation or render a decision on an application.