D.C. Municipal Regulations (Last Updated: September 13, 2017) |
Title 27. CONTRACTS AND PROCUREMENT |
Chapter 27-22. CONTRACTORS |
Section 27-2206. PREAWARD SURVEYS
-
2206.1The contracting officer may require a preaward survey to assist in determining a prospective contractor's capability to perform a proposed contract.
2206.2If the contemplated contract will be ten thousand dollars ($10,000) or less, or will have a fixed price of less than one hundred thousand dollars ($100,000) and will involve only commercial products, the contracting officer shall not request a preaward survey unless circumstances justify the cost of the survey.
2206.3Before beginning a preaward survey, the contracting officer shall ascertain whether the prospective contractor is debarred, suspended, or ineligible. If the prospective contractor is debarred, suspended, or ineligible, the contracting officer shall not proceed with the preaward survey.
2206.4When the prospective contractor surveyed is a certified minority business, the contracting officer shall request information and advice concerning the contractor's capability and past performance from the District of Columbia Local Business Opportunity Commission before making a determination regarding the contractor's responsibility or nonresponsibility.
2206.5When a preaward survey discloses unsatisfactory performance, the contracting officer shall determine the extent to which the prospective contractor plans, or has taken, corrective action.
2206.6The preaward survey report shall indicate any persistent pattern of need under prior contracts for costly and burdensome District assistance to the contractor (such as engineering, inspection, or testing) that were provided to protect the District's interests but not contractually required.
2206.7The contracting officer shall prepare a narrative preaward survey report that documents the results of the preaward survey and provides support for both the evaluation ratings and the determination of responsibility or nonresponsibility.
2206.8The preaward survey report shall, as necessary, include information concerning the contractor's technical capabilities, financial capability, quality assurance procedures, and the quality of the contractor's accounting system.
2206.9The preaward survey report shall be prepared in the form prescribed by the Director.