D.C. Municipal Regulations (Last Updated: September 13, 2017) |
Title 27. CONTRACTS AND PROCUREMENT |
Chapter 27-33. CONTRACT COST PRINCIPLES |
Section 27-3305. TOTAL COSTS
-
3305.1The total cost of a contract shall be the sum of the allowable direct and indirect costs allocable to the contract, incurred or to be incurred, less any allocable credits.
3305.2In ascertaining what constitutes a cost, the contracting officer may consider any generally accepted method of determining or estimating costs that is equitable and is consistently applied, including standard costs properly adjusted for applicable variances.
3305.3Whenever a contractor is required by the District to submit a price proposal, the contractor shall estimate costs in a manner consistent with generally accepted cost accounting practices which are consistently applied, and which are consistent with the provisions of this chapter.