Chapter 25-A24. PLUMBING SYSTEM  


Section 25-A2400. MATERIALS - APPROVED MATERIALS, USE
Section 25-A2401. DESIGN, CONSTRUCTION, AND INSTALLATION - APPROVED SYSTEM AND CLEANABLE FIXTURES
Section 25-A2402. DESIGN, CONSTRUCTION, AND INSTALLATION - HANDWASHING SINK, WATER TEMPERATURE, AND FLOW
Section 25-A2403. DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION, AIR GAP
Section 25-A2404. DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION DEVICE, DESIGN STANDARD
Section 25-A2405. DESIGN, CONSTRUCTION, AND INSTALLATION - CONDITIONING DEVICE, DESIGN
Section 25-A2406. NUMBERS AND CAPACITIES - HANDWASHING SINK
Section 25-A2407. NUMBERS AND CAPACITIES - TOILETS AND URINALS
Section 25-A2408. NUMBERS AND CAPACITIES - SERVICE SINKS
Section 25-A2409. NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, WHEN REQUIRED
Section 25-A2410. NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, CARBONATOR
Section 25-A2411. LOCATION AND PLACEMENT - HANDWASHING SINK
Section 25-A2412. LOCATION AND PLACEMENT - BACKFLOW PREVENTION DEVICE
Section 25-A2413. LOCATION AND PLACEMENT - CONDITIONING DEVICE
Section 25-A2414. OPERATION AND MAINTENANCE - USING A HANDWASHING SINK
Section 25-A2415. OPERATION AND MAINTENANCE - PROHIBITING A CROSS CONNECTION
Section 25-A2416. OPERATION AND MAINTENANCE - SCHEDULING INSPECTION AND SERVICE FOR A WATER SYSTEM DEVICE
Section 25-A2417. OPERATION AND MAINTENANCE - WATER RESERVOIR OF FOGGING DEVICES, CLEANING
Section 25-A2418. OPERATION AND MAINTENANCE - SYSTEM MAINTAINED IN GOOD REPAIR
Section 25-A2419. [DELETED]