D.C. Municipal Regulations (Last Updated: September 13, 2017) |
Title 10. PLANNING AND DEVELOPMENT |
SubTilte 10-C. HISTORIC PRESERVATION |
Chapter 10-C3. HPRB AND CFA REVIEW OF WORK AFFECTING HISTORIC LANDMARKS AND HISTORIC DISTRICTS |
Section 10-C333. SUBSTANTIAL CHANGES TO APPROVED PLANS
-
333.1The applicants shall notify the staff of any change made to approved plans, either before or after permit issuance. A change includes any modification in the design, massing, proportions, dimensions, design, details, materials, finishes, or other aspect of the design that significantly or materially differs from the approved design, or affects the compatibility of the plans with the affected historic property.
333.2The staff shall review a change to determine whether it is consistent with the approved plans and any conditions of the approval by the Board and Mayor's Agent.
(a)If the changes are consistent with the approval, the staff shall indicate its approval by means of a stamp or notation on the approved plans.
(b)If the changes are not consistent with the approval, the staff shall consult with the applicant to ensure that the changes are revised to be consistent with the approved plans. If the staff and applicant are not able to reach agreement, the staff shall refer the matter to the Review Board for resolution.
333.3Applicants shall obtain any construction permit or permit revision required as a result of a substantial change in project plans.