D.C. Municipal Regulations (Last Updated: September 13, 2017) |
Title 25. FOOD OPERATIONS AND COMMUNITY HYGIENE FACILITIES |
SubTilte 25-F. TANNING FACILITY REGULATIONS |
Chapter 25-F6. PHYSICAL FACILITIES DESIGN AND CONSTRUCTION, CLEANABILITY, SANITATION, AND MAINTENANCE |
Section 25-F600. DESIGN & CONSTRUCTION - BUILDING MATERIALS AND WORKMANSHIP
-
600.1The licensee of a newly constructed, remodeled or renovated tanning facility shall ensure that the design, construction, building materials, and workmanship complies with the District’s Construction Codes of 2008, as specified in Section 102.1(a) of this chapter.
600.2The licensee of an existing tanning facility shall maintain in good condition the physical integrity of its tanning facility by repairing or replacing structural or design defects, operating systems, or fixtures in use before the effective date of these regulations in accordance with the District’s Construction Codes of 2008, as specified in Section 102.1.
600.3At least thirty (30) days before beginning construction or remodeling of a tanning facility, the licensee shall submit construction plans with all schedules, including but not limited to floor plans, elevations, and electrical schematics, to the Department for review and approval, as specified in Section 806.